BAO 28 Apr 2015
~1730-1800 UTC the T/RH was replaced at 300m. S boom was in (bad directions) and N boom may be off by 5- 15 degrees too.
NCAR reported all looks good now.
~,4" of precip with last system.
Wednesday, April 29, 2015
Tuesday, April 28, 2015
Data and quicklooks from the Halo Photonics Streamline lidar are available at
https://engineering.arm.gov/~newsom/Doppler/offsite/xpia/Halo/
This includes the "raw" radial velocity data, as well as processed VAD winds, and vertical velocity statistics (variance, skewness, kurtosis, cloud base height, cloud fraction, cloud base vertical velocity, and velocity precision estimates).
The Halo maintained a consistent scan schedule throughout its deployment period (from March 6th to April 16th). The scan schedule was as follows:
https://engineering.arm.gov/~newsom/Doppler/offsite/xpia/Halo/
This includes the "raw" radial velocity data, as well as processed VAD winds, and vertical velocity statistics (variance, skewness, kurtosis, cloud base height, cloud fraction, cloud base vertical velocity, and velocity precision estimates).
The Halo maintained a consistent scan schedule throughout its deployment period (from March 6th to April 16th). The scan schedule was as follows:
- 8 beam PPI scan at 60 deg elevation once every 12 minutes.
- narrow sector scan toward light posts near the EHS stadium once per day.
- ~10 minute slant-path stare near 50-m level on the BAO tower once per hour.
- Vertical stares the rest of the time.
Sunday, April 26, 2015
Motion Table April 24, 2015
Looks very cool, especially when moving.
What you see is the motion table mounted on the trailer with the Vindicator "Egg" sitting on the platform. The trailer sits inside a wind screen/break.
The air compressor that provides power to the motion arms is covered by the blue tarp off to the left.
Looks very cool, especially when moving.
What you see is the motion table mounted on the trailer with the Vindicator "Egg" sitting on the platform. The trailer sits inside a wind screen/break.
The air compressor that provides power to the motion arms is covered by the blue tarp off to the left.
Friday, April 24, 2015
BAO 300m T/RH
Now the fan on this sensor has gone bad. We measure the fan current and our software removes data when the fan is not operating. We could use the data, but they would be contaminated by a radiative heating error.
Replacement being prepared by NCAR and will be replaced some time next week.
All other sensors working.
Now the fan on this sensor has gone bad. We measure the fan current and our software removes data when the fan is not operating. We could use the data, but they would be contaminated by a radiative heating error.
Replacement being prepared by NCAR and will be replaced some time next week.
All other sensors working.
Thursday, April 23, 2015
3D Volume Scans
Over the last three days, the four 200S lidars and HRDL were engaged in testing various configurations of volume scans to measure and visualize flow behind a wind turbine. With this goal, the following two configurations were tested.
1. Small box pattern:
This pattern has a high update rate of once every 15 sec. It envelops a small volume of 100mX100m and from 30m above ground to 130m above ground. This pattern is focused on producing retrievals just behind or ahead of a wind turbine.
2. Medium box pattern:
This pattern covers a slightly larger volume of approx 400mX400m and from surface to 200m above the ground with ~15m vertical resolution at each of the scan intersections. Due to the larger area coverage the update rate is reduced to once every 1 min.
1. Small box pattern:
This pattern has a high update rate of once every 15 sec. It envelops a small volume of 100mX100m and from 30m above ground to 130m above ground. This pattern is focused on producing retrievals just behind or ahead of a wind turbine.
2. Medium box pattern:
This pattern covers a slightly larger volume of approx 400mX400m and from surface to 200m above the ground with ~15m vertical resolution at each of the scan intersections. Due to the larger area coverage the update rate is reduced to once every 1 min.
Tuesday, April 21, 2015
Friday, April 17, 2015
Weather warning - hard hats recommended near the guy wires due to chance for falling ice
Posting for Dan Wolfe:
The situation at the BAO is extremely wet, slushy, and messy. Over 1.5" of precip have fallen, which is a lot of this site, so even the roads are likely to be complicated. There could be slush or possible ice on the tower and guys, so activity near the guys should include using hard hats (available in the Visitor Center and in the trailer at the tower base) in case of ice falling from the guy wires.
The situation at the BAO is extremely wet, slushy, and messy. Over 1.5" of precip have fallen, which is a lot of this site, so even the roads are likely to be complicated. There could be slush or possible ice on the tower and guys, so activity near the guys should include using hard hats (available in the Visitor Center and in the trailer at the tower base) in case of ice falling from the guy wires.
Subscribe to: